Drag Strip Construction Update - June 2011

The team has been putting in some long hours particularly the past couple of weeks to get the drag strip up to grade in preparation of laying pavement this summer.  Currently the two drag lanes are up to engineering specified grades, just some minor feathering required to blend everything together remains, than it should almost be ready for gravel once the engineers sign-off on the work done to date.  The team is now just beginning work on the return road followed by the staging and pit areas.

Many thanks goes out to everyone involved in the design and construction of our 1/4 mile drag strip.